Skip to content
Public-source data on the data desk

Design · 3 min read · March 3, 2026 · 481 words

Title 24 for ADUs: what actually triggers compliance

What California's Title 24 Part 6 energy code means for a new ADU: compliance paths, heat pumps, fenestration, envelope and the CF1R documentation.

Key takeaways

  • Walls: R-21 cavity + R-5 continuous insulation in CZ8/9 (covers most of LA).
  • Roof/ceiling: R-38 cavity for vented attics, R-30 + cool roof for unvented.
  • Slab edge: R-7 to a depth of 16 inches.
On this page

California's Title 24 Part 6 Energy Code is enforced on every new ADU. The 2022 code (in effect since Jan 1, 2023) made heat pumps the prescriptive default. The 2025 update, effective Jan 1, 2026, tightens envelope requirements and pushes solar-ready provisions further. This guide covers what triggers compliance and what an LADBS plan checker actually looks for — and how the answer reshapes your utility connection plan.

Prescriptive vs performance path

There are two routes to compliance. The prescriptive path is a checklist of minimum components (R-values, U-factors, equipment efficiencies). The performance path runs an energy model in CBECC-Res and shows the design beats a code-defined baseline. Most detached ADUs use the prescriptive path; attached ADUs and conversions usually need performance modeling — see detached vs attached vs conversion for the structural context.

Heat pumps are the new default

Under the 2022 code, gas furnaces and gas water heaters are still legal but trigger compliance penalties on the energy budget. The path of least resistance is a heat pump space heater (mini-split or central) and a heat pump water heater. The ENERGY STAR cold-climate heat pump list is a good starting point — though LA basically never needs cold-climate models.

Envelope requirements at a glance

  • Walls: R-21 cavity + R-5 continuous insulation in CZ8/9 (covers most of LA).
  • Roof/ceiling: R-38 cavity for vented attics, R-30 + cool roof for unvented.
  • Slab edge: R-7 to a depth of 16 inches.
  • Windows: U-factor ≤ 0.30, SHGC ≤ 0.23 (west and south orientations).
  • Air leakage: blower-door tested at ≤ 5 ACH50.

Solar-ready and EV-ready

ADUs detached from the primary dwelling are required to comply with solar-ready provisions: a clear roof area facing within 110° of true south. ADUs are exempt from the actual PV requirement that applies to new single-family homes — but if the primary dwelling triggers it, an LADBS plan checker may ask. EV charging: a single 240V outlet in an accessible location is the minimum for any new ADU with a parking space.

The CF1R signoff

Every Title 24 submittal needs a Certificate of Compliance (CF1R) signed by a Certified Energy Analyst. This is the document LADBS stamps. Plan check rejects almost always trace back to a CF1R that doesn't match the architectural drawings — windows on the floor plan that aren't on the CF1R, or HVAC equipment that isn't listed on the CEC Appliance Database. The LA permitting rules cover what else has to land in the intake packet alongside it.

Sources

  1. Title 24 Building Energy Efficiency Standards · California Energy Commission
  2. CBECC-Res Compliance Software · California Energy Commission
  3. ENERGY STAR Heat Pump Criteria · U.S. EPA
  4. California Association of Building Energy Consultants · CABEC
  5. CEC Modernized Appliance Database · California Energy Commission

Next chapter · 01 of 03

Process · 2 min read

LADWP, SoCalGas and your ADU: the utility connection map

Going all-electric to comply also reshapes how you connect to LADWP — and whether you call SoCalGas at all.

Power, water, and gas hookups add meaningful cost and schedule to an ADU project. A walkthrough of the actual approval paths in 2026 — and the factors that determine your specific utility scope.

Continue your read · the editorial path

We chained these chapters in the order LA homeowners actually need them. Each one picks up where the last one left a question open.

  1. 02 / 03

    Design · 2 min

    Designing an ADU you actually want to live in

    Twelve design moves that separate a great 700 sq ft ADU from a generic one — most cost nothing extra, all of them protect your re-sale and rental value.

    Read chapter →
  2. 03 / 03

    Permitting · 4 min

    Los Angeles ADU permitting rules: what applies now

    Current California ADU rules for City of Los Angeles projects: application review, setbacks, height, occupancy, fees and site-specific documents.

    Read chapter →

More in Design

Cross the field — different category, same project