RSA concept study of a residential addition with wood cladding and broad openings

Alteration + new area · Los Angeles

Home additions that connect new space to the house you already have.

An addition is not a small new house attached to an old one. The useful question is where new area can join the existing structure without creating unresolved circulation, structural or building-system conflicts.

Concept imagery · Not represented as completed RSA work

Project fit

When an addition is the right project

A sound starting point when

  • The existing house has useful structure and rooms worth retaining.
  • A defined expansion can solve the space problem without reorganizing the entire residence.
  • The lot and review path can accommodate added floor area, height and construction access.

Compare another path when

  • If changes reach most rooms and systems, compare a whole-home remodel.
  • If the existing structure cannot support the program, compare a ground-up custom home.
  • If the goal is an independent dwelling, use the ADU pathway rather than treating it as an ordinary addition.

Scope decisions and deliverables

01

Existing-condition record

Document the legal floor plan, structure, roof, levels, utilities and the connection area before assuming what can stay.

Deliverable

Measured existing-condition plan and permit-history question list.

02

Expansion direction

Compare rear, side and second-story options against setbacks, lot coverage, circulation, daylight, privacy and construction impact.

Deliverable

Option comparison with the reason one direction advances.

03

Old-to-new coordination

Resolve foundations, lateral system, roof drainage, waterproofing, heating and cooling, electrical and plumbing at the connection.

Deliverable

Coordinated permit set identifying retained and new work.

04

Occupied-home strategy

Decide whether the house can be occupied, what must be isolated and when services will be interrupted before construction sequencing is set.

Deliverable

Access, protection, temporary-service and decision schedule.

Deliverables table

Existing-condition record

Decision it supports
Which legal rooms, structure, levels, roof forms and services can anchor the addition design.
What remains open
Concealed framing, foundations and service capacity remain open until investigation resolves them.

Expansion option comparison

Decision it supports
Whether a rear, side or upper-level direction best fits the property and homeowner priorities.
What remains open
Agency or consultant confirmation not yet received stays marked as a dependency.

Old-to-new coordination set

Decision it supports
How retained and new structure, envelope, drainage and building systems connect.
What remains open
Field conditions that cannot be verified without opening the building are not represented as known.

Phasing and scope basis

Decision it supports
What can be isolated, when services are interrupted and what the construction proposal includes.
What remains open
Temporary work, allowances and occupancy assumptions remain separately visible until agreed.

What changes the scope

The legal plan or permit history does not match the house on site.

Scope effect
The retained-area basis and approval path may change before addition work can be defined.
How it is resolved
Reconcile the record with the responsible jurisdiction instead of designing from an unverified plan.

Investigation finds inadequate foundation, lateral capacity, roof support or a difficult connection.

Scope effect
Structural work can extend beyond the new room or floor area.
How it is resolved
Update engineering and identify the affected existing work before revising the proposal.

Added area requires electrical, heating/cooling, sewer, water or drainage upgrades.

Scope effect
Equipment, routes and utility coordination expand beyond the visible addition.
How it is resolved
Add the system work to the coordinated drawings and state any capacity confirmation still pending.

The owner changes occupancy, access or finish-continuity requirements.

Scope effect
Protection, temporary services, sequencing and work in retained rooms may change.
How it is resolved
Revise the phasing basis and identify the added retained-area work before construction starts.

Proposal readiness

An addition proposal needs a verified connection—not only a square-foot target.

Can be defined now

  • Measured retained and new work shown separately.
  • The selected expansion direction and design basis.
  • Consultant, permit and construction responsibilities.
  • Protection, access and known service-interruption assumptions.

Must remain explicit

  • Concealed conditions at the connection.
  • Unconfirmed utility and equipment capacity.
  • Agency corrections not yet received.
  • Selections or temporary-work decisions still pending.

Decision Room

Turn this project path into a working brief.

Use the same scope logic from this page to compare assumptions, record unresolved conditions and prepare better questions.

Compare paths

If changes reach most rooms and systems, compare a whole-home remodel.

Identify cost drivers

Accurate records for the existing house and any prior additions.

Prepare the permit path

Address, parcel number and any prior permit documents.

Site and design dependencies

  • Accurate records for the existing house and any prior additions.
  • Structural investigation at the proposed connection.
  • Setbacks, lot coverage, height and any design or historic review.
  • Electrical, heating/cooling, sewer and water capacity for added area.
  • Access for demolition, excavation, material delivery and weather protection.

What to prepare

  1. 1Address, parcel number and any prior permit documents.
  2. 2Existing plans or a list of rooms and conditions that must remain.
  3. 3The problem the added area must solve, not only a target square footage.
  4. 4Known drainage, foundation, roof or utility issues.
  5. 5Whether the home must remain occupied during the work.

Questions that shape the decision

Is an addition reviewed as new construction or an alteration?
It contains both: newly created area and work where it connects to the existing building. The drawings should identify new, altered and retained work clearly; the responsible agency determines the applicable review for the actual scope.
When should we consider a second story?
When ground-level setbacks or open-space priorities constrain expansion, but only after the existing foundation, lateral system, access and temporary weather protection are studied. It is a structural and sequencing decision, not just a floor-plan choice.
What should be documented before design?
The legal existing plan, levels, roof and foundation conditions, utility locations, connection area and known permit history. Unknown concealed conditions should stay explicit until investigation resolves them.

Primary sources

RSA location

Based in Beverly Hills, serving Greater Los Angeles.

8484 Wilshire Blvd, Beverly Hills, CA 90211
(818) 724-8623

Your next step

Start with the property and the decision you need to make.

Discuss an addition