Custom home & large renovation budget simulator

A project-scale planning model for custom estates and major remodels in the Santa Barbara County markets. Configure up to three scenarios — design options or site conditions — and compare them side by side. Everything is editable; nothing is stored or sent anywhere.

Illustrative planning model built from editable hypothetical amounts — not a quote, not a bid, not market benchmark data, and not a determination that any site or scope is buildable or permittable. Replace every line with real proposals before making financial decisions.

Cost buckets

Every amount and spread is owner-editable. Seeded figures are illustrative placeholders.

Grading, drainage, retaining, driveways — site-dependent; geotechnical findings move this the most.

Result — Scenario A

BucketLowHigh
Site infrastructure$175,000$400,000
Structure & envelope$1,080,000$1,957,500
Interiors & finishes$675,000$1,440,000
Design & engineering$187,000$308,000
Permits & fees allowance$60,000$120,000
Utility connections$60,000$140,000
Landscaping allowance$90,000$300,000
Contingency$279,240$559,860
Duration soft costs$180,000$180,000
All-in project budget$2,786,240$5,405,360

Core build rate (structure + interiors)

$390–$755 / conditioned sq ft

All-in budget per conditioned sq ft

$619–$1,201 / conditioned sq ft

Includes site work, design, fees, utilities, landscaping, contingency and soft costs — never compare this figure against a builder's quoted construction rate.

Scenario comparison

ScenarioAll-in lowAll-in highCore $/sq ft
Scenario A$2,786,240$5,405,360$390–$755
Scenario B$2,786,240$5,405,360$390–$755
Scenario C$2,786,240$5,405,360$390–$755

What this model excludes

  • Land acquisition, financing points and closing costs
  • Permit and impact fees beyond the editable allowance (confirm with the agency)
  • Sales tax on materials (jurisdiction-specific; confirm current rates)
  • Hazardous-materials survey or abatement on existing structures
  • Utility main extensions or capacity upgrades quoted by the utility
  • Furnishings, art and AV equipment beyond allowances
  • Cost escalation beyond the modeled duration

Questions to ask before committing

  • Which buckets did each bidder exclude — and are the exclusions identical across bids?
  • Is the geotechnical report final, and does the site line reflect its findings?
  • What is the assumed escalation if the schedule extends six months?
  • Which allowances are placeholders, and what would make each one move?
  • Who carries the contingency — and how are draws against it documented?