The Estate Project Planner.

Answer nine questions about your property and scope. The planner assembles the complexity drivers, the documentation worth gathering, and a printable brief you can bring to any conversation — with us or anyone else. Nothing here is a quote; it is a map of what an honest estimate must resolve.

The property.

What this scope must resolve.

Select a location and a scope and the planner assembles the picture here — complexity drivers, documentation, and the questions an honest estimate must answer.

Cost education · 2026–2027 planning

The anatomy of a real budget.

We publish no dollar figures here — a number without your survey, your site and your scope is marketing, not information. What transfers across every project is the structure a complete budget must have. If a proposal you receive is missing one of these phases, that absence is the first question to ask.

  1. 01

    Investigation & feasibility

    Survey, geotechnical, existing-conditions assessment, title and easement review. Small relative to construction, and the line item that most often prevents the expensive surprises.

  2. 02

    Design & engineering

    Architecture, structural, civil, MEP, energy (Title 24) and landscape. Design fees scale with complexity and review rounds, not just square footage — a design-review-heavy jurisdiction budgets more here.

  3. 03

    Permits, fees & studies

    Plan check and permit fees, school and utility fees where applicable, and jurisdiction-specific studies. These are set by the agencies and change on their schedules — the current fee schedule, not a blog post, is the source.

  4. 04

    Construction

    The contract sum: structure, envelope, systems, finishes, site work. In 2026–2027 planning, the honest drivers remain scope definition, site difficulty, finish level and how much was resolved before the contract was signed.

  5. 05

    Contingency & owner costs

    A real budget carries contingency for what investigation could not see, plus owner-side costs: temporary housing, storage, landscaping restoration, furnishings. Budgets that omit these are not smaller — they are incomplete.

Planning in 2026–2027: material and labor markets, fee schedules and review timelines all move. Treat any figure older than a current bid against a defined scope as context, not a number to plan against.