Skip to content
Public-source data on the data desk

Process · 4 min read · February 18, 2026 · 777 words

How should I compare contractors and construction bids?

A California homeowner workflow for checking a contracting entity and comparing scope, allowances, exclusions, responsibilities, payment milestones and unknowns.

Key takeaways

  • Who prepares and coordinates drawings, engineering, energy documents and agency corrections?
  • Who applies for and picks up permits, pays agency charges and schedules inspections?
  • Who investigates utility capacity, sewer, soils, existing construction, access and hazardous materials?
On this page

Answered in this guide

Go directly to an answer below.

  1. Are you licensed and insured?
  2. How does the contract work?

More across the studio · the full FAQ map · the reference desk

Do not begin with a ranking or the lowest total. Begin by identifying the legal entity that would sign the contract, checking that entity in the official CSLB license lookup, and putting every proposal into the same scope structure. A useful comparison makes included work, allowances, exclusions, permit responsibility, site and utility work, payment milestones, change procedures and unresolved conditions visible. RSA’s license status is not stated on this website; verify any proposed RSA contracting entity and license number directly in the CSLB record before signing.

1. Identify and verify the contracting entity

Ask each bidder for the exact legal business name and CSLB license number that will appear on the contract. Search by license number and confirm the record belongs to that entity, is currently active, and lists classifications relevant to the work proposed. A classification describes the contracting scope the licensee is authorized to undertake; it is not a statement that the contractor is qualified for every condition on your property. If a home-improvement salesperson is involved, verify that person’s registration as well.

2. Read the public record without overreading it

Review the license status, classifications, bond information, workers’ compensation information and public complaint disclosures linked from the CSLB record. CSLB warns that complaint disclosure is restricted by law and its database may not yet contain all relevant information. A license bond is not project insurance or a guarantee of recovery. CSLB does not require commercial general-liability insurance for most licensed contractors. Ask for current insurance documents for the proposed entity and project, then confirm coverage questions with the insurer or your own adviser rather than treating a certificate or database field as a coverage opinion.

3. Normalize the scope before looking at totals

Put each proposal into the same categories: design and consultants; permits and agency coordination; demolition and site protection; foundation and structure; enclosure; mechanical, electrical and plumbing systems; finishes and equipment; utilities; closeout; restoration; and contingency. Mark each line included, allowance, excluded or unknown. Use the cost pillar to expose missing categories, the financing calculator to test only your own funding assumptions, and the permit directory to identify the responsible authority without relying on a postal city.

4. Compare responsibility, not just materials

  • Who prepares and coordinates drawings, engineering, energy documents and agency corrections?
  • Who applies for and picks up permits, pays agency charges and schedules inspections?
  • Who investigates utility capacity, sewer, soils, existing construction, access and hazardous materials?
  • Which selections are allowances, what amount is included, and how are credits, overages and markup handled?
  • Which owner-supplied items or third-party scopes must be coordinated, stored, protected or installed?
  • What must occur before a payment milestone is earned, and what documents show that milestone is complete?

5. Read the contract and change process together

CSLB’s consumer guidance says a home-improvement contract over the statutory threshold must be in writing and include required identifying, scope, price, payment, schedule and notice information. California limits the down payment in a home-improvement contract to $1,000 or 10 percent of the contract price, whichever is less, and CSLB says payments cannot exceed the value of work performed or materials delivered, except for the down payment. Scope or price changes must be documented in a written change order signed before the changed work begins. Exceptions and project-specific application can matter, so use the official guide and obtain legal advice for the actual agreement.

6. Check references against the same questions

Ask references about a comparable scope and property condition, then ask how the written scope matched the work, how unknowns and corrections were documented, whether payment requests matched described milestones, how changes were approved, how the site was protected, and what remained at closeout. References are one input; they do not replace license, contract, insurance, permit or property-specific review.

The Project Studio proposal comparison applies this worksheet to up to three bids: mark each scope row included, allowance, excluded or unknown, and it generates the questions to send each bidder. Entries stay in your browser tab unless you include them in an inquiry.

Sources

  1. CSLB License Check · Contractors State License Board
  2. CSLB — Finding the Right Contractor · Contractors State License Board
  3. CSLB — Learn About Home Improvement Contracts · Contractors State License Board
  4. CSLB — Homeowner Checklists · Contractors State License Board
  5. CSLB — Workers’ Compensation Requirements · Contractors State License Board
  6. CSLB — Contractor Bond Requirements · Contractors State License Board

Private proposal worksheet

Compare scope before comparing totals.

Enter only what each written proposal states. Blank amounts remain unknown. Nothing is uploaded, submitted or used to rank a contractor.

Proposal A

Drawings, engineering, energy documents, agency submissions, corrections, fees and permit pickup.

Demolition, access, protection, grading, trenching, service upgrades, sewer and restoration.

Excavation, concrete, framing, structural steel and work tied to soils or existing conditions.

Roofing, waterproofing, insulation, windows, doors, exterior finishes and weather protection.

Electrical, plumbing, heating, cooling, ventilation, testing and equipment startup.

Drywall, flooring, cabinetry, counters, tile, fixtures, appliances, paint and finish standards.

Inspections, corrections, manuals, warranties, cleanup, punch list and disturbed-area restoration.

Who controls the reserve, permitted uses, approvals, unused balance and known investigation gaps.

Disclosed-line subtotal

No disclosed amounts

8 of 8 amounts remain unknown. This is not an all-in comparison.

Proposal B

Drawings, engineering, energy documents, agency submissions, corrections, fees and permit pickup.

Demolition, access, protection, grading, trenching, service upgrades, sewer and restoration.

Excavation, concrete, framing, structural steel and work tied to soils or existing conditions.

Roofing, waterproofing, insulation, windows, doors, exterior finishes and weather protection.

Electrical, plumbing, heating, cooling, ventilation, testing and equipment startup.

Drywall, flooring, cabinetry, counters, tile, fixtures, appliances, paint and finish standards.

Inspections, corrections, manuals, warranties, cleanup, punch list and disturbed-area restoration.

Who controls the reserve, permitted uses, approvals, unused balance and known investigation gaps.

Disclosed-line subtotal

No disclosed amounts

8 of 8 amounts remain unknown. This is not an all-in comparison.

Proposal C

Drawings, engineering, energy documents, agency submissions, corrections, fees and permit pickup.

Demolition, access, protection, grading, trenching, service upgrades, sewer and restoration.

Excavation, concrete, framing, structural steel and work tied to soils or existing conditions.

Roofing, waterproofing, insulation, windows, doors, exterior finishes and weather protection.

Electrical, plumbing, heating, cooling, ventilation, testing and equipment startup.

Drywall, flooring, cabinetry, counters, tile, fixtures, appliances, paint and finish standards.

Inspections, corrections, manuals, warranties, cleanup, punch list and disturbed-area restoration.

Who controls the reserve, permitted uses, approvals, unused balance and known investigation gaps.

Disclosed-line subtotal

No disclosed amounts

8 of 8 amounts remain unknown. This is not an all-in comparison.

Terms to align

Resolve these in the written proposals.

Next chapter · 01 of 03

Cost · 4 min read

The anatomy of an LA ADU build, line by line

Now map each proposal into the same complete budget structure before comparing disclosed totals.

How to organize an LA detached ADU budget — soft costs, site work, construction, contingency, and the unknowns to resolve before comparing totals.

FAQ · Process

Questions about this guide

  1. Are you licensed and insured?
    Contractor identity, license status and classifications should be verified directly through the California Contractors State License Board. Insurance, bonding and the contracting entity for a proposed engagement must be confirmed in writing before signing.
  2. How does the contract work?
    Contract structure depends on the engagement. Before signing, confirm the scope and deliverables for each phase, payment schedule, exclusions, assumptions, change procedure, ownership of documents and conditions required before construction pricing can be finalized.

Continue your read · the editorial path

We chained these chapters in the order LA homeowners actually need them. Each one picks up where the last one left a question open.

  1. 02 / 03

    Permitting · 4 min

    The LA ADU permit path, phase by phase

    Find the responsible jurisdiction, assemble a complete application, track written corrections and clear property-specific referrals without treating the statutory clock as a permit guarantee.

    Read chapter →
  2. 03 / 03

    Finance · 5 min

    A California homeowner’s guide to funding an ADU

    Compare cash, home equity, refinance and construction funding by liquidity, lien position, draw rules, reserves and written lender terms—not an advertised rate alone.

    Read chapter →

More in Process

Cross the field — different category, same project