What a permit clock does and does not cover

State baseline reviewed September 26, 2026. Local procedures, exceptions and parcel conditions still apply.

The statutory review clock

After an ADU application is submitted, the local agency must say in writing within 15 business days whether it is complete, and generally approve or deny a complete application within 60 days (Gov. Code § 66317). The clock measures agency review of a complete application — not design, corrections, utility work or construction.

Gov. Code § 66317 →

Applicant corrections

If the agency finds the application incomplete or issues corrections, the time the applicant's team spends revising drawings and resubmitting is outside the agency's clock. Complete, coordinated drawings are the part of the schedule the owner's team controls most.

Permit sequence guide →

Utility work

Water, sewer, electric and gas connections are reviewed and scheduled by the utility or agency that owns each system, sometimes on separate applications. Their timing is not set by the ADU review clock; ask each provider what it needs and when.

Utility connection guide →

Construction dependencies

Once a permit is issued, duration depends on scope, site conditions, material lead times, inspections and any correction notices in the field. No general duration applies to every property; a schedule should be built from the actual scope.

Build a project brief →

Direct answer

Which permit path applies to your property

What documents should I gather first?

Permit history, a zoning report, a boundary or topographic survey where the site requires one, and utility information. The project passport lists each unknown with the source that answers it and why it matters.

City and service reference

  1. Who reviews a siding project in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  2. Which approvals apply to a siding project in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  3. Who reviews a deck project in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  4. Which approvals apply to a deck project in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  5. Who reviews a concrete project in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  6. Which approvals apply to a concrete project in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  7. Who reviews a window and door project in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  8. Which approvals apply to a window and door project in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  9. Who reviews a foundation work in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  10. Which approvals apply to a foundation work in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  11. Who reviews a framing scope in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  12. Which approvals apply to a framing scope in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  13. Who reviews a seismic retrofit in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  14. Which approvals apply to a seismic retrofit in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  15. Who reviews a hillside project in West Hollywood?
    West Hollywood Planning Division is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  16. Which approvals apply to a hillside project in West Hollywood?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  17. Who reviews a ADU in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  18. Which approvals apply to a ADU in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  19. Who reviews a garage conversion in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  20. Which approvals apply to a garage conversion in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  21. Who reviews a JADU in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  22. Which approvals apply to a JADU in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  23. Who reviews a home addition in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  24. Which approvals apply to a home addition in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  25. Who reviews a kitchen remodel in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  26. Which approvals apply to a kitchen remodel in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  27. Who reviews a bathroom remodel in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  28. Which approvals apply to a bathroom remodel in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  29. Who reviews a whole-home remodel in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  30. Which approvals apply to a whole-home remodel in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  31. Who reviews a roofing project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  32. Which approvals apply to a roofing project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  33. Who reviews a siding project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  34. Which approvals apply to a siding project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  35. Who reviews a deck project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  36. Which approvals apply to a deck project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  37. Who reviews a concrete project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  38. Which approvals apply to a concrete project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  39. Who reviews a window and door project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  40. Which approvals apply to a window and door project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  41. Who reviews a foundation work in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  42. Which approvals apply to a foundation work in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  43. Who reviews a framing scope in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  44. Which approvals apply to a framing scope in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  45. Who reviews a seismic retrofit in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  46. Which approvals apply to a seismic retrofit in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  47. Who reviews a hillside project in Compton?
    Compton Building & Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  48. Which approvals apply to a hillside project in Compton?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  49. Who reviews a ADU in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  50. Which approvals apply to a ADU in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  51. Who reviews a garage conversion in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  52. Which approvals apply to a garage conversion in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  53. Who reviews a JADU in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  54. Which approvals apply to a JADU in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  55. Who reviews a home addition in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  56. Which approvals apply to a home addition in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  57. Who reviews a kitchen remodel in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  58. Which approvals apply to a kitchen remodel in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.
  59. Who reviews a bathroom remodel in El Segundo?
    El Segundo Planning & Building Safety is listed as the primary permit authority. Planning, utilities, fire or other agencies may also be involved depending on the address and scope.
  60. Which approvals apply to a bathroom remodel in El Segundo?
    The applicable pathway depends on the property, proposed work and jurisdiction. Requirements should be confirmed against current official sources before design commitments are made.

City permits guides — the deep dive

Every FAQ above is anchored in real jurisdiction data. For full line-item breakdowns, plan-check timelines, and city-specific schedules, open the permits guide for the city you're building in.